Capstone Projects

Operating Facilities

Ganaraska

Year Built

2016

Capstone Ownership

50%

Nameplate Capacity (MW)

17.6

Ganaraska

Overview

The ZEP Wind Farm Ganaraska is a 17.60 megawatt (MW) wind energy project located in the town of Orono, Ontario. In April 2010, the project was awarded a 20-year term power purchase agreement by the IESO under the Feed-in Tariff (FIT) program. The project consists of 9 Senvion (formerly named REpower) MM92 wind turbines, with a rated capacity of 2.05 MW or 1.88 MW.

Renewable Energy Approval No. 1426-9RWTSS Download 

Reports prepared in support of an application for a Renewable Energy Approval (“REA”) were completed to satisfy the requirements of O. Reg. 359/09 and can be viewed below.




Other Projects

Erie Shores Wind Farm

Erie Shores Wind Farm consists of 661 General Electric SLE1.5 wind turbines/gener...

Glen Dhu

The Glen Dhu facility, located near Merigomish, Nova Scotia, consists of 27 Enercon E-82 wind turbin...

News Centre

Contact

P: 416 649 1300
E: info@capstoneinfra.com
155 Wellington Street West, Suite 2930
Toronto, Ontario Canada
M5V 3H1

Copyright © All right reserved